05 / FAQ
Common questions when preparing an industrial RFQ.
For a project-specific requirement, send the BOQ, MTO, MRL or datasheet so the applicable specification can be reviewed with the enquiry.
What information should I include in a material RFQ?
Include the product description, material grade, size, wall thickness or pressure class, applicable
standard, quantity, required documentation, delivery location and required date. A BOQ, MTO, MRL or
project datasheet is ideal.
Which standards should I include in a piping RFQ?
Depending on the product and project, commonly referenced standards include API, ASTM, ASME, EN, DIN and
NACE/ISO 15156 requirements. The applicable project specification remains the controlling requirement.
Which quality and inspection documents can be requested?
Depending on the order and project specification, documentation can include mill test certificates, EN
10204 3.1 certificates, heat-number traceability, inspection records, PMI reports and other agreed quality
documents.
Can Gasify support a complete piping material requirement?
Yes. Gasify can coordinate sourcing for pipes, valves, fittings, flanges and related materials from a BOQ, MTO, MRL or project specification, subject to availability and the applicable project requirements.